Old Town Sewer Rehabilitation
|
|
Budget
|
$4,300,000
|
|
Est. Completion
|
November 2012
|
|
Status
|
Underway
|
|
Contact
|
Engineering Division
910-947-6315
|
|
This project, done concurrently with the Lake Pinehurst sewer rehabilitation project, rehabilitates and/or repairs the sewer system infrastructure located in the Old Town section of Pinehurst, which was installed in the early 1900s and is primarily terra cotta. There have been numerous obstructions in the system and there is a risk of environmental consequences if the system is not rehabilitated. Additional information regarding this project can be found at the following website: http://www.hydrostructures.com/moore-county-sewer-rehabilitation
|
|